An installation conversation should begin with the wall and the selected panel, rather than with a screw-spacing number. Before work starts, confirm which panel will be used, what structure will carry it, and how the wall's openings and edges will be detailed. Those answers determine which drawings, fixings and accessories the project team needs to review.

Tegravo's installation material shows a typical assembly sequence on a light-steel demonstration frame. Steel-framed buildings, modular units and existing drywall assemblies each add their own design questions. Use the checklist below to prepare a useful technical enquiry and site handover.

Key Takeaways

  • Identify the selected panel, installation direction and effective coverage width.
  • Show the load-bearing support and mark openings, joints, corners and exposed edges.
  • Agree what will be checked before each stage is covered.

Identify the panel and its direction

Record the selected panel or the specification you are considering, including its formed edge, length, thickness and finish. Check which dimension is the effective covering width and which is the overall width including the joint. The layout and piece count should use the correct definition. Tegravo's product information lists a standard effective covering width of 383 mm; confirm the overall dimension and available combination for the actual panel selected.

Also establish the proposed installation direction and the position of the first panel. A printed finish or catalogue image alone does not identify the matching edge profile or every accessory. If you are still selecting a panel, compare the current product information and send the wall layout with your enquiry.

Show what will carry the fixings

The critical question is where each mechanical fixing will end. Provide a drawing or clear photographs of the steel members, studs, battens or designed secondary supports behind the finished face. The project team should check their spacing, condition, alignment and ability to take the proposed fixings. A decorative facing, plasterboard surface or thin skin should not be assumed to be the load-bearing fixing substrate.

If the existing wall is uneven, the correction belongs in the prepared support system and project detail. Tightening a panel against an unsuitable surface is not a substitute for a level, reliable support. Fastener type, length, spacing and any closer fixing at edges or corners are project decisions made against the selected panel and wall design.

Mark every edge and opening before laying out the panels

Send elevations or sketches that show the bottom and top of the wall, internal and external corners, windows, doors, service penetrations and the places where metal panels meet another material. Mark intended vertical joints and any structural or modular movement joints separately. These drawings help the project team plan the starter trim, panel courses, end trims, corner pieces, joint profiles and weather details.

The installation reference shows a practical sequence: establish a level line, fix and recheck the starter trim, seat the first panel fully, mechanically fix its concealed upper edge to the support, engage each following tongue-and-groove joint along its length, and then complete the specified edge and opening details. Adhesive shown on corner trim helps position that accessory; it does not replace the panel's mechanical fixing. The drawings for the actual wall must still define water management, sealing and any required movement.

Add the questions specific to your building type

Building situationInformation to prepareDecision for the project team
Steel-framed wallSteel member or secondary support layout, openings, wall layers and fixing proposalConfirm the load-bearing fixing path, support alignment and complete exterior wall detail
Modular or mobile unitWhether panels are fitted before transport or on site, lifting and transport conditions, module joint locationsDesign joints that can accommodate the expected movement and decide what must be inspected after transport
Existing wall or drywall assemblyCondition of the existing facing, position of load-bearing studs or new supports, fire and moisture layers, openingsConfirm that fixings reach a designed support and that alterations preserve the required wall functions

A standard vertical panel joint should not be assumed to bridge two independently moving modules. For drywall, fastening to the plasterboard face alone is not established by the installation demonstration. If the project requires fire, acoustic or moisture performance, the responsible designer must check the whole wall assembly and the relevant details.

Agree on site checks before details are covered

Before each stage hides the previous one, record the support and wall layers, starter-trim line, first-panel fit, hidden fixing points and joint engagement. At completion, check alignment, edge coverage, surface damage and whether cutting swarf has been removed. The final acceptance checks and any site tests should follow the approved project drawings and the instructions supplied for the selected panel and order.

For material handling, support long panels along their length, protect the coated surface, and keep stored panels dry and raised on a level base. These basic precautions help preserve the panels while the installation team prepares the work; the formal instructions supplied with an order should match the particular panel.

Send a useful installation enquiry

You can begin with a sketch rather than a complete construction package. Tell Tegravo the panel specification or preferred look, the required wall area and destination port, and attach the wall or frame layout if available. For a modular unit, add the transport and module-joint details; for an existing building, add photographs of the wall and openings. We can discuss the relevant panel and accessory information, while your design and construction team confirms the installation method for the project.